통합체계지원의 12대 요소 적용 방안

서양우* ; 이원 ; 이세일 ; 이종신
LIG넥스원 미사일시스템 IPS연구소 수석연구원
Study on the Application of 12 Elements for Integrated Product Support
Yangwoo Seo* ; Won Lee ; Seil Lee ; Jongsin Lee
Chief research engineer, Missile Systems Integrated Product Support R&D Lab, LIG Nex1

Correspondence to: *Yangwoo Seo Missile Systems Integrated Product Support R&D Lab, LIG Nex1 20, Daewangpangyo-ro 851 beon-gil, Sujeong-gu, Seongnam-si, Gyeonggi-do, Republic of Korea Tel: +82-31-326-9255 Fax: +82-31-326-9001 E-mail: yangwoo.seo2@lignex1.com

Ⓒ 2025 Korea Society for Naval Science & Technology

초록

본 논문은 통합체계지원의 개념을 명확히 이해하여 최적의 IPS 요소별 적용 방안을 제시하였다. ‘system’이 아닌 ‘materiel’ 용어를 이해하고, product 계약 기반의 통합체계지원 활동을 사업 특성을 고려하여 수행해야 함을 제시하였다. 첫째, 총수명주기 비용 절감을 위한 Product 기반의 IPS 요소별 적용 계획을 개발해야 한다. 둘째, Product에 기반한 WBS를 활용하여 수행해야 할 작업 요소와 최종 제품을 연결한다. 마지막으로 Sustainment 측면에서는 무기체계의 설계 변경부터 IPS 요소 영역 내의 변경 사항에 이르기까지 지속적으로 통합하여 적용해야 한다. 이를 위해서는 국내 규정 반영 및 조직 설립이 우선 순위이며, 이를 통해 발전적인 IPS 업무가 진행되기를 기대한다.

Abstract

This paper clearly understood the concept of integrated product support and suggested an optimal application plan for each IPS element. It was suggested that the term ‘materiel’, not ‘system’, should be understood and the product contract based integrated product support activity should be carried out in consideration of the business characteristics. First, it is necessary to develop a product based IPS elements application plan to reduce the cost of the total life cycle. Second, using WBS based on product, the work elements to be performed and the final product are connected. Finally, in terms of sustainment, it is necessary to continuously integrate and apply from the design change of the weapon system to the change within the IPS elements area. To this end, reflecting domestic regulations and establishing an organization is a priority, and through this, it is expected that developmental IPS work will proceed.

Keywords:

Key Performance Parameter, Integrated Logistics Support, Integrated Product Support, Product Support Analysis, Work Breakdown Structure

키워드:

핵심성능지표, 종합군수지원, 통합체계지원, 체계지원분석, 작업분할구조